New Development in Benahavís, Costa del Sol
395.000 €
Benahavís · 2 - 3 beds · 85 - 128 m² built
Reference
R5110336
Type
New Development
Location
Benahavís
Beds
2 - 3
Baths
2
Build m²
85 - 128
Terrace m²
11 - 101
Pool
Yes
Parking
Yes
Garden
Yes
New Development: Prices from €395,000 to €890,000. [Bedrooms: 2 - 3] [Bathrooms: 2] [Built size: 85m2 - 128m2].
Located in the heart of Benahavís, a new residential development is being launched featuring 28 Mediterranean-style apartments with 2 or 3 bedrooms. Each home includes a private underground parking space and access to a communal rooftop pool.
This development offers a unique opportunity to enjoy an authentic Andalusian lifestyle, surrounded by natural beauty near the Serranía de Ronda mountains and the Guadalmina River. Just a 5-minute drive away are some of the region’s top golf courses, and the popular destinations of San Pedro de Alcántara and Puerto Banús are only 15 minutes away.
The apartments will be delivered fully equipped with high-quality materials, premium finishes, and a distinctive, contemporary interior design. The project has already received its construction license, with building set to begin in May 2025 and completion scheduled for April 2027. Each unit also comes with pre-installation for an electric vehicle charging point.
Located in the heart of Benahavís, a new residential development is being launched featuring 28 Mediterranean-style apartments with 2 or 3 bedrooms. Each home includes a private underground parking space and access to a communal rooftop pool.
This development offers a unique opportunity to enjoy an authentic Andalusian lifestyle, surrounded by natural beauty near the Serranía de Ronda mountains and the Guadalmina River. Just a 5-minute drive away are some of the region’s top golf courses, and the popular destinations of San Pedro de Alcántara and Puerto Banús are only 15 minutes away.
The apartments will be delivered fully equipped with high-quality materials, premium finishes, and a distinctive, contemporary interior design. The project has already received its construction license, with building set to begin in May 2025 and completion scheduled for April 2027. Each unit also comes with pre-installation for an electric vehicle charging point.
Additional Features
Village
Close To Golf
Close To Town
Close To Schools
South East
New Construction
Communal
Hot A/C
Cold A/C
Mountain
Urban
Lift
Fitted Wardrobes
Near Transport
Private Terrace
Solarium
Storage Room
Ensuite Bathroom
Access for people with reduced mobility
Double Glazing
Basement
Not Furnished
Fully Fitted
Kitchen-Lounge
Communal
Gated Complex
Entry Phone
Underground
Garage
Private
EV charge point
Electricity
Drinkable Water
Off Plan
Contemporary
New Development

